case studies

Biwater Leisure has been involved in many prestigious projects over the years. 

Click on the links below to view a small sample.

location


category


case study list

Spain
Biwater Leisure undertook a series of unique and exciting landscape water feature designs for the Shimizu and Ritz Carlton corporations on the prestigious Hotel Arts Complex, Barcelona.

England
Biwater Leisure designed and installed 2 km of pipework serving the central and corner fountains.

England
The Splashworld Leisure Centre in Southport opened in the summer of 2007 and is attached to the existing Dunes Leisure Centre. The new Centre is a large and modern building incorporating the new pools and slides together with a changing village and cafeteria.

England
A new, remodelled leisure centre that incorporates a refurbished 25m competition pool, a separate leisure pool with flume, a fast moving river, a wave machine and many water features.

United Arab Emirates
Biwater Leisure undertook the project management for the design, supply and installation of the water filtration and feature systems on this prestigious project in Dubai.

United Kingdom
The swimming baths at Fullwell Cross originally housed a 33 metre long, eight lane pool which was constructed in 1967. This was sub divided at a later date into a 25 metre long main pool and learner pool using a fixed boom and fixed false floor.

England
Biwater Leisure was commissioned to inspect the swimming pool plant installation following the catastrophic flooding in 2007.

United States
Detailed design of waterpark water treatment and features