Biwater Leisure was commissioned to inspect the swimming pool plant installation following the catastrophic flooding in 2007. The pool plant room, located in the basement of the building, was submerged under four meters of water. Following this, the client called in experts to assess the damage and provide proposals for the re-instatement of the pool and treatment systems.
Biwater mechanical and electrical engineers attended site over a number of days and provided a comprehensive document detailing the damage to all pieces of equipment, from sand filters to flowmeters, together with recommendations for actions required to re-instate the pool complex.